Excavator operation job hazard analysis (JHA) template

Excavator work carries struck-by, caught-between, tip-over, utility strike and overhead line hazards. OSHA requires that no employee be permitted underneath loads handled by lifting or digging equipment (29 CFR 1926.651(e)), and that utilities be located before digging. Keep people out of the swing radius and know what is underground.

JHA template

Excavator operation

StepHazardControls
1. Walk around and inspect the machineDefective brakes, alarm, seat belt or…Confirm the seat belt is provided and works. As good…
2. Plan the dig and locate utilitiesStriking a buried lineReroute the dig or de-energize and relocate the line…
3. Set up the machine and the work zoneOverhead line contactHave lines de-energized or moved before any work…

The task

Digging, loading and trenching with a hydraulic excavator, including pre-use checks, utility locates, safe positioning and parking.

Steps, hazards and controls

Controls run from most effective to least. A citation beside a control means an OSHA paragraph requires it; with no citation it is good practice.

StepHazardControls
1. Walk around and inspect the machineDefective brakes, alarm, seat belt or hydraulics
  1. Administrative control: Confirm the seat belt is provided and works. As good practice, also check brakes, horn, backup alarm, lights and hydraulic hoses at the start of each shift. (29 CFR 1926.602(a)(2)(i))
  2. Administrative control: Make sure the cab glass is safety glass with no visible distortion that affects safe operation. Keep mirrors and cameras working as good practice. (29 CFR 1926.600(a)(5))
  3. Administrative control: Remove a defective machine from service and tag it.
2. Plan the dig and locate utilitiesStriking a buried line
  1. Eliminate: Reroute the dig or de-energize and relocate the line where the owner agrees.
  2. Administrative control: Determine the estimated location of underground utilities before the excavation is opened. (29 CFR 1926.651(b)(1))
  3. Administrative control: Find the exact location by safe means when the dig approaches the estimated location. (29 CFR 1926.651(b)(3))
  4. Administrative control: Protect, support or remove underground installations while the excavation is open. (29 CFR 1926.651(b)(4))
3. Set up the machine and the work zoneOverhead line contact
  1. Eliminate: Have lines de-energized or moved before any work near them.
  2. Administrative control: Keep the minimum clearance from lines, and designate a person to watch clearance when the operator cannot judge it. (29 CFR 1926.600(a)(6)(iv))
  3. Administrative control: Treat any overhead wire as energized until the owner says otherwise and it is visibly grounded. (29 CFR 1926.600(a)(6)(vi))
Machine rolls or slides on a slope or soft edge
  1. Engineering control: Keep the machine back from the edge, and keep spoil and equipment at least 2 feet from the edge of an excavation. (29 CFR 1926.651(j)(2))
  2. Administrative control: Plan the machine position so the tracks sit on firm, level ground.
4. Dig and loadStruck by the bucket, boom or swing
  1. Eliminate: Keep all workers out of the swing radius; use barricades or cones to mark it.
  2. Administrative control: Do not permit anyone underneath loads handled by lifting or digging equipment. (29 CFR 1926.651(e))
  3. Administrative control: Agree on hand signals, and keep eye contact with the signal person.
  4. PPE: Wear hard hat, hi-vis vest and safety glasses when outside the cab.
Overturning from side-slope loads or high-sitting loads
  1. Engineering control: Use the rated capacity chart or load rating, and do not exceed it.
  2. Administrative control: Wear the seat belt whenever you are in the seat.
5. Work around trenches and trafficCave-in or machine falls into the trench
  1. Engineering control: Make sure a protective system is in place before anyone enters the trench. (29 CFR 1926.652(a)(1))
  2. Administrative control: Keep spoil and equipment at least 2 feet from the edge, or use retaining devices. (29 CFR 1926.651(j)(2))
  3. Administrative control: Have a competent person inspect the excavation daily. (29 CFR 1926.651(k)(1))
Struck by vehicles or backing hazard
  1. Engineering control: Use the reverse alarm on equipment that has an obstructed view to the rear, or use an observer. (29 CFR 1926.602(a)(9)(ii))
  2. PPE: Wear high-visibility clothing when exposed to traffic. (29 CFR 1926.651(d))
6. Lift and place pipe or materialDropped pipe or load
  1. Administrative control: Inspect rigging before use on each shift and remove defective rigging from service. Use rigging rated for the load. (29 CFR 1926.251(a)(1))
  2. Administrative control: Follow the lift plan and keep all workers out from under the load. (29 CFR 1926.651(e))
7. Park, shut down and secureMachine moves or is tampered with when parked
  1. Administrative control: Set the parking brake, and chock the wheels when parked on an incline. Fully lower the bucket when the machine is not in use. (29 CFR 1926.600(a)(3)(ii))
  2. Administrative control: Remove the key and lock the cab.

Required PPE

What the standard says

  • No one is permitted under loads handled by digging equipment. (29 CFR 1926.651(e))

    “No employee shall be permitted underneath loads handled by lifting or digging equipment.”
  • Locate underground utilities before opening the excavation. (29 CFR 1926.651(b)(1))

    “The estimated location of utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, shall be determined prior to opening an excavation.”
  • Keep spoil and equipment at least 2 feet from the edge. (29 CFR 1926.651(j)(2))

    “Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations.”
  • Earthmoving equipment covered by the standard must have seat belts, except stand-up equipment and machines without ROPS or a canopy. (29 CFR 1926.602(a)(2)(i))

    “Seat belts shall be provided on all equipment covered by this section”
  • Set the parking brake, and chock wheels on inclines. (29 CFR 1926.600(a)(3)(ii))

    “Whenever the equipment is parked, the parking brake shall be set. Equipment parked on inclines shall have the wheels chocked and the parking brake set.”
  • Treat any overhead wire as energized. (29 CFR 1926.600(a)(6)(vi))

    “Any overhead wire shall be considered to be an energized line unless and until the person owning such line or the electrical utility authorities indicate that it is not an energized line and it has been visibly grounded”
  • Use a reverse alarm, or an observer. (29 CFR 1926.602(a)(9)(ii))

    “No employer shall permit earthmoving or compacting equipment which has an obstructed view to the rear to be used in reverse gear unless”

Frequently asked questions

Does OSHA require a JHA for excavator operation?
OSHA does not require a written JHA for excavator work. It does require utility locates, protection from loads and daily inspection of excavations (29 CFR 1926.651). Where no specific rule applies, the training duty in 29 CFR 1926.21(b)(2) covers it.
What goes in a typical excavator operation JHA?
Include the machine inspection, utility locates, set-up, digging, working near trenches and traffic, lifting, and parking. Name the operator, the spotter and the competent person for the excavation.
How close can I pile spoil to the trench edge?
Keep excavated material and equipment at least 2 feet from the edge of the excavation, or use retaining devices that prevent them from falling or rolling in (29 CFR 1926.651(j)(2)).

Related toolbox talks

PRINT AND EDIT

JHA template pack, $29

All 20 task templates as editable Word and Excel files and as PDF, in English and Spanish, plus a blank master form. Change them for your site and your equipment and use them inside your company.

  • 20 task JHA templates, editable Word (DOCX)
  • The same 20 as Excel (XLSX) and PDF
  • English and Spanish versions
  • A blank master JHA form
  • Hazards, ranked controls, PPE and the OSHA paragraphs for each task

Instant download. 30-day refund, no questions.