Demolition job hazard analysis (JHA) template

Demolition crews face unplanned collapse, live utilities, falling debris and hazardous dust. Before work starts, OSHA requires a competent person to complete an engineering survey of the structure (29 CFR 1926.850(a)), and service lines must be shut off, capped or controlled. Survey first, then sequence the work so the building stays stable as it comes down.

JHA template

Demolition

StepHazardControls
1. Survey the structure and the hazardsUnplanned collapse of floors, walls or…Shore or brace walls and floors of a structure…
2. Isolate utilitiesContact with live electric, gas, water or…Shut off, cap or otherwise control electric, gas…
3. Protect the site and the publicDebris and dust reach people at entrances…Protect employee entrances to multi-story structures…

The task

Taking down a multi-story building or interior structure by hand and with machines, including surveys, utility isolation, debris handling and ongoing inspection.

Steps, hazards and controls

Controls run from most effective to least. A citation beside a control means an OSHA paragraph requires it; with no citation it is good practice.

StepHazardControls
1. Survey the structure and the hazardsUnplanned collapse of floors, walls or framing
  1. Engineering control: Shore or brace walls and floors of a structure damaged by fire, flood or explosion before employees work inside. (29 CFR 1926.850(b))
  2. Administrative control: Have a competent person complete an engineering survey of framing, floors and walls before demolition begins. (29 CFR 1926.850(a))
  3. Administrative control: Write a demolition sequence from the survey and brief the crew on it.
Hazardous materials in the structure
  1. Eliminate: Have asbestos, lead paint and other hazardous materials identified and removed by qualified crews before general demolition.
  2. Administrative control: Keep the survey results on site and stop work if an unknown material is found.
2. Isolate utilitiesContact with live electric, gas, water or steam lines
  1. Eliminate: Shut off, cap or otherwise control electric, gas, water, steam, sewer and other service lines outside the building line before demolition starts. (29 CFR 1926.850(c))
  2. Engineering control: Temporarily relocate and protect any utility that has to stay in service. (29 CFR 1926.850(d))
  3. Administrative control: Verify isolation in writing with the utility, and lock out the sources.
3. Protect the site and the publicDebris and dust reach people at entrances and outside the footprint
  1. Engineering control: Protect employee entrances to multi-story structures being demolished with sidewalk sheds or canopies or both. (29 CFR 1926.850(k))
  2. Engineering control: Barricade the drop zone and the perimeter, and post signs.
  3. Administrative control: Use water to control dust and set a no-entry exclusion zone for non-essential workers.
4. Control floor openings and debris dropsFall through a floor opening, or struck by dropped debris
  1. Engineering control: Cover floor openings that are not material drops with material strong enough for any load and secure it. (29 CFR 1926.850(i))
  2. Engineering control: Enclose the drop area with barricades when debris is dropped through floor holes without chutes. (29 CFR 1926.850(h))
  3. Engineering control: Install a substantial gate at or near the discharge end of each chute, and assign a competent employee to control the gate and the truck loading. (29 CFR 1926.852(c))
  4. Administrative control: Do not drop material outside the exterior walls unless the area is effectively protected. (29 CFR 1926.852(a))
5. Take the structure downMachine strikes a worker or brings down more than planned
  1. Eliminate: Keep all workers out of areas that can be affected when balling or clamming is being done. (29 CFR 1926.859(a))
  2. Engineering control: Keep the crane boom and load line as short as possible. (29 CFR 1926.859(c))
  3. Engineering control: Attach the demolition ball with a swivel connection and by positive means so it cannot disconnect. (29 CFR 1926.859(d))
  4. Administrative control: Cut free all steel members affected before pulling over walls. (29 CFR 1926.859(e))
  5. Administrative control: Remove roof cornices and ornamental stonework before pulling walls over. (29 CFR 1926.859(f))
6. Inspect as the work progressesWeakened floors, walls or loosened material as demolition goes on
  1. Administrative control: Have a competent person make continuing inspections as the work progresses for hazards from weakened floors or walls or loose material. (29 CFR 1926.859(g))
  2. Administrative control: Keep everyone out of any area where the inspection finds such a hazard until it is corrected by shoring, bracing or other effective means. (29 CFR 1926.859(g))
  3. Administrative control: Hold a short briefing at the start of each shift on what changed since the last one.
7. Clear debris and close outFalling and tripping hazards in the clean-up
  1. Administrative control: Keep walkways clear and remove debris in the order planned.
  2. Administrative control: Keep the discharge area of a chute closed off when operations are not in progress. (29 CFR 1926.852(d))
  3. PPE: Wear a hard hat, eye protection, gloves, boots and a respirator when dust requires it.

Required PPE

  • Hard hat
  • Safety glasses or goggles
  • Work gloves
  • Steel-toe, puncture-resistant boots
  • Hearing protection when machines run
  • Respirator where dust or hazardous materials are present

What the standard says

  • A competent person must complete an engineering survey before demolition starts. (29 CFR 1926.850(a))

    “Prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls”
  • Shut off, cap or control all service lines before demolition starts. (29 CFR 1926.850(c))

    “All electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside the building line before demolition work is started.”
  • Cover floor openings that are not material drops. (29 CFR 1926.850(i))

    “All floor openings, not used as material drops, shall be covered over with material substantial enough to support the weight of any load which may be imposed.”
  • Protect employee entrances with sidewalk sheds or canopies. (29 CFR 1926.850(k))

    “Employee entrances to multi-story structures being demolished shall be completely protected by sidewalk sheds or canopies, or both”
  • Keep workers out of areas affected by balling or clamming. (29 CFR 1926.859(a))

    “No workers shall be permitted in any area, which can be adversely affected by demolition operations, when balling or clamming is being performed.”
  • A competent person must inspect as the work progresses. (29 CFR 1926.859(g))

    “During demolition, continuing inspections by a competent person shall be made as the work progresses to detect hazards resulting from weakened or deteriorated floors, or walls, or loosened material.”

Frequently asked questions

Does OSHA require a JHA for demolition?
OSHA does not require a written JHA for demolition. It does require an engineering survey by a competent person before demolition starts, with written evidence that the survey was done (29 CFR 1926.850(a)), and continuing inspections as work progresses (29 CFR 1926.859(g)). The training duty in 29 CFR 1926.21(b)(2) also covers the crew.
What goes in a demolition JHA?
Include the survey, utility isolation, site protection, floor openings and debris drops, the demolition itself, inspections and clean-up. For each hazard list controls from strongest to weakest and name the competent person.
Who must inspect the structure during demolition?
A competent person must make continuing inspections as the work progresses to detect hazards from weakened or deteriorated floors or walls or loosened material (29 CFR 1926.859(g)). Write the inspection on the daily log.

Related toolbox talks

PRINT AND EDIT

JHA template pack, $29

All 20 task templates as editable Word and Excel files and as PDF, in English and Spanish, plus a blank master form. Change them for your site and your equipment and use them inside your company.

  • 20 task JHA templates, editable Word (DOCX)
  • The same 20 as Excel (XLSX) and PDF
  • English and Spanish versions
  • A blank master JHA form
  • Hazards, ranked controls, PPE and the OSHA paragraphs for each task

Instant download. 30-day refund, no questions.